Up a level |
Sudarjanto, Atjep and Candra Fertilia, Novika and DEWI, RAFAMA and Mahardika, Fajar (2022) ANALISIS PERCEPATAN WAKTU PELAKSANAAN PEKERJAAN PADA PROYEK PEMBANGUNAN JALAN TOL MENGGUNAKAN METODE TIME COST TRADE OFF (Studi Kasus: Proyek Jalan Tol Cinere – Jagorawi Seksi 3). C-Line, XII (1). pp. 60-67. (Unpublished)