ANALISIS BIAYA DAN WAKTU MENGGUNAKAN METODE LINE OF BALANCE DENGAN PENDEKATAN PRODUKTIVITAS ALAT BERAT DALAM PROYEK PEMBANGUNAN JALAN TOL RUAS CINERE – JAGORAWI (Studi Kasus : CIJAGO Seksi 3 STA 14+375 – 13+975)

Sudarjanto, Atjep and buldan, fauzi and DEWI, RAFAMA and Hasna Fadilah, ajeng (2022) ANALISIS BIAYA DAN WAKTU MENGGUNAKAN METODE LINE OF BALANCE DENGAN PENDEKATAN PRODUKTIVITAS ALAT BERAT DALAM PROYEK PEMBANGUNAN JALAN TOL RUAS CINERE – JAGORAWI (Studi Kasus : CIJAGO Seksi 3 STA 14+375 – 13+975). C-Line, XII (1). pp. 30-39. (Unpublished)

[img] Text
1505-File Utama Naskah-2693-1-10-20230211.pdf

Download (661kB)
Official URL: https://ejournal.istn.ac.id/index.php/cline/issue/...
Item Type: Article
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering, Science and Mathematics > School of Civil Engineering and the Environment
Depositing User: Rafama Dewi
Date Deposited: 13 Feb 2023 02:16
Last Modified: 13 Feb 2023 02:16
URI: http://repository.istn.ac.id/id/eprint/4999

Actions (login required)

View Item View Item