Sudarjanto, Atjep and Candra Fertilia, Novika and DEWI, RAFAMA and Mahardika, Fajar (2022) ANALISIS PERCEPATAN WAKTU PELAKSANAAN PEKERJAAN PADA PROYEK PEMBANGUNAN JALAN TOL MENGGUNAKAN METODE TIME COST TRADE OFF (Studi Kasus: Proyek Jalan Tol Cinere – Jagorawi Seksi 3). C-Line, XII (1). pp. 60-67. (Unpublished)
Text
1506-File Utama Naskah-2695-1-10-20230211.pdf Download (615kB) |
Official URL: https://ejournal.istn.ac.id/index.php/cline/issue/...
Item Type: | Article |
---|---|
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Depositing User: | Rafama Dewi |
Date Deposited: | 13 Feb 2023 02:18 |
Last Modified: | 13 Feb 2023 02:18 |
URI: | http://repository.istn.ac.id/id/eprint/5000 |
Actions (login required)
View Item |